Road Reconstruction – including Milling, Paving, Sidewalk and Curb Installation – entailed more than 40 Concrete Structures (Manholes and Inlets); 8,500 Linear-Feet of Concrete Curb; approximately 1,500 Linear-Feet of 12-inch and 15-inch Reinforced Concrete Pipe; 700 Square Yards of 4-inch thick Sidewalk; and more than 300 Yards of 6-inch Concrete Driveway within the borough.