Essentially an Emergency Road Repair on I-95 just south of Exit 6, Lucas Construction Group mobilized quickly to address hazardous road conditions caused by The New Jersey Turnpike’s widening project. A nearly mile-long shallow trench, caused by a Temporary Construction Lane Shift, posed a potential threat to drivers on both sides of the roadway. The highway was Milled and Paved in both north and south-bound directions, utilizing two milling machines and a Paving Train.

Image Gallery