This Road Project entailed Reconstruction of approximately one mile of River Road, North of Route 287. Extensive Storm Drainage Upgrades, including a large Underground Detention System with Multiple Vortechnic Storm Filter Units, were added along the road’s length. ADA-compliant Sidewalks and Curbing were installed to complement the final Full-Width Roadway Paving of the area.

Image Gallery