This bridge construction utilized the Installation of Steel Pilings driven under a Precast Drainage Culvert. Additionally, Steel Sheeting was installed along the embankments and the Wing Walls. Final embellishments included a Decorative Concrete Parapet with Powder-Coated Railing and complete Road Resurfacing. During construction, both Water and Sewer Utilities were required to be temporarily bypassed around the project site.

Image Gallery