This Bridge Project consisted of 3 Separate Concrete Culvert Stream Crossings along Zion Road. Construction incorporated 54-inch and 78-inch Reinforced Concrete Culvert Pipe; approximately 9,000 pounds of Galvanized Steel; and over 12,000 pounds of Reinforcement Steel. Road Reconstruction and Resurfacing of approximately three-quarters of a mile, requiring over 1500 tons of asphalt, completed the work.

Image Gallery