This DOT Drainage Project entailed the installation of New Drainage Systems at two separate locations along Route 1 in South Brunswick and extensive Bedrock Removal. The install required logistical consideration of existing Multiple Utilities and Fiber Optic Duct Banks. Roadway Reconstruction of the work zone completed the project.

Image Gallery