The construction of a Water Utility, crossing State Highway Route 35, entailed a Directional Drill Operation, sending a 10-inch Main under Route 35 which tied into the Existing Main. The scope of the project consisted of Cutting and Capping Existing Water Mains; Excavation; Backfill; and Right of Way Restoration.

Image Gallery