This DOT Drainage Project entailed the installation of New Drainage Systems at two separate locations along Route 1 in South Brunswick and extensive Bedrock Removal. The install required logistical consideration of existing Multiple Utilities and Fiber Optic Duct Banks. Roadway Reconstruction of the work zone completed the project.